
Add to Cart
CSCE of the principles
1. To care for health and safety of employees as corporate responsibility,all production activities must give priority to employee’s safety and health.
2. To control the production process effectively and abide by law and meet customer’s requirements.
3. Focus on customer’s normal needs, with high quality high efficiency management to provide high quality service and products.
4. Save resources,lower energy consumption. Reduce environmental pollution caused by production.
5. Abide by law.
Continuous improvement, sustainable operation.
Product Drawing:
Product Description:
Part Number | SC-TS 6X6 SMT |
Part Type | SMD Switch |
Rating | DC12V 50mA |
Manufacturer | Original Manufacturer |
Contact Resistance | ≤0.03mΩ |
Operation Temp | ‘-20℃ ~ +70℃ |
Electrical Life | 100,000 Cycles Min |
Operating Force | 1.8N-2.8N |
Dielectric Strength | AC250V(50/60Hz for 1minute) |
Enviroment humidity | -25-+70°C |
Relative humidity | (40°C)≤95% |
Insulation Resistance | ≥100mΩ |
Voltage withstand | AC250V 50Hz/min |
Push knorb height size | Can be choosed H=1.5/3.0/3.5/4.0/4.3/4.5/5.0mm |
Welding Conditions | Hand Soldering 350℃ Max 3s Max |
Condition for Reflow 260℃Max 5s Max | |
Welding time(seconds) | 3S |
Welding capacity | 60W max |
Dielectirc Voltage Proof | 250V AC (50HZ/60HZ) 1min |
Our advantage
1. Short lead time: 7~10 days under 50k pcs.
2. High quality with competitive prices.
3. Free samples can provided.
4. Good service to each customers.
FAQ
*Q: Can I get samples from you?
A: We are honored to offer you samples for quality check.
*Q: What parts are manufactured by you?
A: All of frame parts are manufactured by us.
*Q: What's the leading time? (How long do you need to prepare my goods?)
A: 5 days for sample orders. 15 days for mass production orders (based on different quantities)
*Q: How long do I need to wait before my goods arrive?
A: 3-5 days for international express. 5-7 days for air transportation, 15-30 days for sea transportation.