
Add to Cart
Quick Details:
Specification: | USB Connector | Cross Part NO: | SC1310 |
Shell: | Copper Alloy | Samples: | Available 2-3 Pcs |
Product Specification:
Contact Current Roting | 1.8 Amperes For pin1&pin4 0.25 Amperes other contacts |
Dielectric Withstanding Voltage | AC 100V (RMS) |
Insulation Resistance | 100Megohms Minimum |
Contact Resistance | 30mΩ Max For pin1&pin4 |
Moling Force | 35 Newtorns,Minimum |
Material Housing | PBT |
Material Contact | Copper Alloy |
Material Shell | SUS |
Plating Shell | Nickel Plated |
Operating Temperature | -55℃ To +85℃ |
Colar | Blue |
Why Choosing us ?
1. Achieve win-win
2. Competitive price
3. More than 14 years experiences
4. High Quality
5. Lead time:7-10 days
6. Offer technology support.
7. Professional and experienced engineers
If you can't find the exact product you need in the pictures,please don't go away.Just contact me freely or send your sample and drawing to us.We will reply you as soon as possible
our services
OEM/ODM Capability:
Our complete range of products manufactured according to ISO 9001:2000 guidelines is at your disposal.
OEM services encompass buyers logo or label, designs services plus a whole after sales support package.
Our Services
Our complete range of products manufactured according to ISO 9001:2000 guidelines is at your disposal.
OEM services encompass buyers logo or label, designs services plus a whole after sales support package.
Customer Satisfaction:
Please don’t hesitate to contact us if you have any questions or concerns before or after your purchase. We are committed to your 100% satisfaction.
Payment Terms:
There are many payment methods available such as D/A, D/P, T/T and Paypal
Why Choose CSCE
3. 3000 workers - We have over 3000 workers.
4. Have R&D dept, engineer can design products as you need, develop tooling as customer require.
5.180,000 square meters - The area of CSCE is 180,000 square meters.
7.Have plating factory, can plate Sn,Nickel,gold,Palladium Gold wire,flat pin,shield, terminal etc products as customer need.
8. Certification - We have passed ISO9001-2000 Quality Management System,ISO14001 Environment Management System, and UL, ROHS…
FAQ
*Q:Can I get samples from you?
A:We are honored to offer you samples for quality check.
*Q:What parts are manufactured by you?
A:All of frame parts are manufactured by us.
*Q:What's the leading time? (How long do you need to prepare my goods?)
A:5 days for sample orders. 15 days for mass production orders (based on different quantities)
*Q:How long do I need to wait before my goods arrive?
A:3-5 days for international express. 5-7 days for air transportation, 15-30 days for sea transportation.
Product Drawing: