
Add to Cart
USB3.0 Connector 90 Degree USB SMT Connector USB Male Female Connector |
Quick Details:
Specification: | USB Connector | Cross Part NO: | SC3USB |
Shell: | Copper Alloy | Samples: | Available 2-3 Pcs |
Product Specification:
Contact Current Roting | 1.8 Amperes For pin1&pin4 |
Dielectric Withstanding Voltage | AC 100V (RMS) |
Insulation Resistance | 100Megohms Minimum |
Contact Resistance | 30mΩ Max For pin1&pin4 |
Moling Force | 35 Newtorns,Minimum |
Material Housing | PBT+30%GF;UL94V-0 |
Material Contact | Copper Alloy |
Material Shell | Brass |
Plating Shell | Nickel Plated |
Operating Temperature | -55℃ To +85℃ |
Colar | Blue |
Why choose us?
100% Guarantee Quality
· Free samples (excluding freight charge)
· 10 years experience for RJ45, RJ11, RJ12.4.Within a period of 12 months from the date of shipment.
· Manufactured Under Strict Controls.
· Online technical support.
· Factory evaluation anytime.
· 100% Tested before shipment.
Our advantage
1. Short lead time: 7~10 days under 50k pcs.
2. High quality with competitive prices.
3. Free samples can provided.
4. Good service to each customers.
• ISO 9001:2008
• UL Certification
• Active Environmental Policy
Pre-sale service:
1. We try to do best communicate with every customer about all the questions and promptly
2. We provide pre-sale service in various forms, such as we can provide options for customer choose. So that customers can a reasonable plan with less cost.
In-sale service:
1. We do double check before the products sent out
2. We do choose the safe shipping
3. We do make sure you can get the products on time
After service:
1. We do follow up after you get the products
2. We will answer customer questions in time. If need, we can provide free guidance if customer need new rqquirements.
3. If we have new products, we can recommend you in advance, when you place the second order, we will happy to give you a discount.
FAQ
*Q:Can I get samples from you?
A:We are honored to offer you samples for quality check.
*Q:What parts are manufactured by you?
A:All of frame parts are manufactured by us.
*Q:What's the leading time? (How long do you need to prepare my goods?)
A:5 days for sample orders. 15 days for mass production orders (based on different quantities)
*Q:How long do I need to wait before my goods arrive?
A:3-5 days for international express. 5-7 days for air transportation, 15-30 days for sea transportation.
Product Drawing: